R*TIME Technical Papers
James E. Themig, Northeast Utilities Service Company, "R*TIME/WIN Client/Server in the Control Room & on the Desktop," (1.13 MB) User's Group Meeting, Columbus, OH, June 23-27, 1997.
R*TIME User's Group Presentations
2004
- Display Calculation
- OC Design Process
- R*TIME & eDNA at DC Cook
- R*TIME Get Archive Data Clones
- R*TIME Message Summary
- R*TIME Server V12.1
- R*TIME TIP Processing
- Viewer 4.2
- Viewer 4.3
2005
- Using PMAX and R*TME
- Data Driven Graphics
- Firewalls
- Issues Tracking
- R*TIME Data Viewer on the Internet
- R*TIME Server 12.2 New Features
- Tricks and Features of the Data Viewer
- Viewer 4.3 - What's New
2006
- Bridging Paradigm Gaps
- ER & CM - PMAX-R*TIME
- Integrated Network Monitoring
- Prairie Island PPCS Replacement Project
- SONGS Custom Displays
- Viewer 4.4 UGM 2006
2007
- Patch Management for Real Time Systems
- R*TIME Database Generation for Clinton Station
- Viewer 4.5 New Features
2009
- Using Code Templates to Enhance Software Consistency and Quality
- Initiative to Support Utility Compliance with Latest NARC Cyber Security Rule Making
- Evergreen Approach to PPC Management
- 1F-2 PPC Replacement Project
- Next Generation HMI Concepts Discussion
- DAS Migration Lessons Learned
- R*TIME Global Interface
- Balancing Security, Business Requirements and Company IT Standards
- Integrating Plant Systems into the PPC at Prairie Island
- R*TIME Viewer New Features
- R*TIME Server New Features
2010
- RAPID Finding Alternative Sourcing Solutions for All Your Parts Needs, Dan Meils, Scientech RAPID
- Appraisal of Exelon PPC Lifecycle Initiatives, Kevin J. Lindsay, Exelon, BSC-IT
- Control Systems Asset Protection at the Electronic Security Perimeter, David Graham, Owl Computing Technologies, Inc.
- Cyber Security -- Putting a Human Face on a Technical Threat, David Hinrichs, Scientech
- Early Perspectives in the Plant Process Computer (PPC) Replacement Project, Constellation Energy, Calvert Cliffs Nuclear Power Plant
- Main Plant Computer System DAS Replacement Project, Ray Gagnon, Scientech and Christopher Chen, NextEra Energy Seabrook
- Millstone PPC Network Design and Security, Millstone Nuclear Plant, Dominion
- Millstone Unit 3 PPC Replacement, Millstone Nuclear Plant, Dominion
- Online I/O Upgrades--Comparison of Peach Bottom and Oyster Creek, Steve Cafrelli, Exelon
- Utilizing Unidirectional Security Gateways to Achieve Cyber Security for Industrial Environments, Lior Frenkle, Waterfall Security Solutions, Ltd.
2012
- Byron & Braidwood PPC Replacement and Power Uprate Support, Kevin Rumbaugh and Mike Behrens, Exelon
- Knowledge Retention Stategy using CMAPS, Joe Clupp, Manager Nuclear Real Time, Exelon
- Optimizing the Man-Machine Interface, Robert Molloy, President, CyberResearch, Inc.
- The Emerging Role of Energy as the Key to Economic Prosperity for the United States, Scott Gregory Minos, US Department of Energy
- PPC Replacement Regulatory Impacts, Duane Cox and Ron Triplett, Constellation Energy
- Fleet Implementation of Data Diodes, Steve Cafrelli, Exelon BSC-IT
- A Report of 1F Status about Great East Japan Earthquake, Tokyo Electric Power Services Co., Ltd.
- The Great East Japan Earthquake and Current Status of Nuclear Power Station, Tokyo Electric Power Services Co., Ltd
- Plant Process Computer Replacement, Brian Allen, Project Engineer, Calvert Cliffs Nuclear Power Plant
2013
- Advanced Analytic Solutions, Theresa Sutter, Scientech Information Technologies
- DC Cook Main Control Room Annunciator Replacement Project, Robert Ammon, Scientech
- DC Cook Plant Process Computer Replacement Project, Robert Ammon, Scientech
- DC Cook RCI Replacement Project, Robert Ammon, Scientech
- Enertech Post Fukushima Technologies for BWR Mark I and II Hardened Containment Vent, Enertech
- LaSalle Station PPC "Refresh" Project, Kevin J. Lindsay, Exelon
- Lessons Learned at Calvert Cliffs PPC Replacement, Brian Allen, Project Engineer, Calvert Cliffs
- Optimizing the Software Development Process, Ray Gagnon, Scientech
- R*TIME 2013 New Features, Robert Ammon and Ray Gagnon, Scientech
- R*TIME Maintenance Contracts, Laura Kinghorn, Scientech
- R*TIME V12 Updates, Robert Ammon and Ray Gagnon, Scientech
- EA-12-051, a Spent Fuel Pool Level Monitoring System Design Perspective, Don Chase, Scientech
- R*TIME-Based Monitoring System in Fukushima Daiichi Nuclear Power Station, Manabu Murata, Tokyo Electric Power Services Co. LTD
2015
- TREAT Modeling and Simulation Development with Validation Requirements - Presented by Mark D. DeHart, PhD, Deputy Director for Reactor Physics, Modeling and Simulation, Nuclear Science and Technology, Idaho National Laboratory
- StressWave SRV Leak Detection - Presented by: Sal Tareen, Senior Engineer, Scientech
- Plant Process Computers - Past, Present and Future - Presented by:Don Chase, Plant Process Systems, Scientech
- Overview of Wireless Technology Implementation - Presented by: Chad Kiger, AMS Corporation
- A New Programming Model for R*TIME Applications - Presented by Kevin Coble, Senior Software Engineer, Scientech
- General Overview and Introduction to EMC Concepts - Presented by: Chad Kiger, AMS Corporation
- Fukushima Daiichi (1F) Central Remote Monitoring System - Presented by: Hidefumi Naito, Tokoyo Electric Power Services Co., Ltd
- HCI - Human Computer Interface - Presented by: Craig Crandall, Exelon
- Virtualization as an Obsolescence Mitigation Strategy - Presented by: Paul Carlson, Exelon Corporation and Ray Gagnon, Scientech
- Mobile Access to R*TIME Data - Presented by: Kevin Rumbaugh, Exelon Corporation